Close Menu
Denmark Review
  • Home
  • News
  • Business
  • Sports
  • Travel
Facebook X (Twitter) Instagram
Denmark Review
Trending
  • Tyseer Denmark Joins Virginia Tech Football from Penn State
  • Foreign Troops Arrive in Greenland
  • Understanding the Unity of the Realm: What You Need to Know
  • Denmark Urges Global Review of Canada’s Skeleton Decisions
  • Free “How to Live in Denmark” Audiobooks on Spotify
  • Norway vs. Denmark: Disappointment and Fear in the Aftermath
  • Increased Loan Offers Driven by Restructuring and Demand
  • Stoltenberg Aims to Eliminate the Thousand Mark
Friday, January 16
  • Home
  • News
  • Business
  • Sports
  • Travel
Denmark Review
Home » Bridge closure paralyzes traffic across the Øresund Bridge and extends travel time
News

Bridge closure paralyzes traffic across the Øresund Bridge and extends travel time

Denmark ReviewBy Denmark ReviewJune 15, 2025No Comments2 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link

Bridge closures paralyze traffic across the Øresund Bridge and extend travel times.

The article was updated at 2:38 p.m.

Traffic drivers report that there are queues on and over the Øresund Bridge in connection with the half marathon.

Travel time has been extended by up to an hour across the Øresund Bridge in connection with the half-marathon Broløbet over the bridge.

This is stated in the Danish Road Directorate’s traffic information at around 1:30 p.m.

According to DR P4 Traffic, the queue begins before exit 18 at Tårnby.

“We are now receiving several reports from road users who say that traffic on the bridge has more or less collapsed. There is massive traffic jams on and over,” writes P4 Trafik at 12.40.

It is also reported that road users have been on the bridge for one and a half to two hours.

There is also a queue on the other side. On the Swedish side, there is a queue towards the bridge’s toll booth.

The 2025 Bridge Race will be held in connection with the Øresund Bridge’s 25th birthday.

From 10 am on Sunday, the half marathon, which extends over the bridge, began, which is why it was already announced before Sunday that traffic would be affected.

The bridge is open during the race, but operates at a reduced speed and generally extended travel time.

Until 1:30 p.m., traffic in the bridge tunnel is one-way. The direction changes every 15 minutes.

From 1:30 p.m. to 5:00 p.m., one lane will be open to cars in both directions.

Ritzau

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Denmark Review
  • Website

Related Posts

Foreign Troops Arrive in Greenland

January 16, 2026

Denmark Urges Global Review of Canada’s Skeleton Decisions

January 15, 2026

Increased Loan Offers Driven by Restructuring and Demand

January 15, 2026

Comments are closed.

Lastest Posts

Tyseer Denmark Joins Virginia Tech Football from Penn State

January 16, 2026

Foreign Troops Arrive in Greenland

January 16, 2026

Understanding the Unity of the Realm: What You Need to Know

January 16, 2026

Denmark Urges Global Review of Canada’s Skeleton Decisions

January 15, 2026
Popular Posts
News

Parliament toughens penalties for possession and sale of opioids

Vehicles used to sell opioids can be confiscated, and sellers can be stripped of their…

Employee asked manager about relabeling stale salad: All Danish KFC restaurants get smiley with a sour or straight mouth

June 23, 2025

Denmark Leads Nordics in ETF Investor Growth – AMWatch

November 24, 2025

Man jailed for dangerous assault at Odense train station

June 21, 2025
© 2026 Denmark Review

Type above and press Enter to search. Press Esc to cancel.